Every counter below is the same counter in both frames. Nothing was torn out. Lab stone was poured directly over the existing surface and finished on site — typically in a single 8–12 hour day.
The cabinets, the layout and the plumbing all stayed exactly where they were. That is the whole point: in most Phoenix kitchens the cabinets are fine and it is only the counter that reads as dated.